Trade-by-Trade · All 50 States

Home Improvement Permit Guide

Which projects require permits — and what happens if you skip them. Covers every major trade plus contractor licensing requirements for all 50 states.

Important: Permit requirements vary by city, county, and state. The information below reflects national norms and common state practices, but your local building department always has final authority. When in doubt, call your building department before starting any project — it's free, and the cost of unpermitted work is not.

Permit Required
No Permit Needed
Varies by Jurisdiction
⚡

Electrical

ProjectPermit?
Panel upgrade or replacement (100A, 200A, 400A) Required
New electrical circuits or subpanels Required
EV charger installation (new 240V circuit) Required
New outdoor outlet, GFCI, or fixture (new circuit) Required
Like-for-like outlet or switch replacement Not Needed
Whole-home rewire Required
Whole-home generator (permanently wired) Required
Solar panel system installation Required
Battery storage system (e.g., Tesla Powerwall) Required
Smart home wiring / low-voltage systems Not Needed
🔧

Plumbing

ProjectPermit?
Water heater replacement (tank or tankless) Required
Full home re-pipe (copper, PEX) Required
New bathroom or kitchen addition (plumbing) Required
Sewer line replacement or repair Required
Water softener installation Varies
Faucet, toilet, or fixture replacement (like-for-like) Not Needed
Garbage disposal replacement (like-for-like) Not Needed
Water main service line replacement Required
Septic system installation or major repair Required
Backflow preventer installation Required
❄️

HVAC

ProjectPermit?
New HVAC system installation (furnace + AC or heat pump) Required
Like-for-like HVAC replacement (same location, same size) Varies
New ductwork installation Required
Mini-split installation (new outdoor + indoor units) Required
HVAC tune-up, filter change, or minor repair Not Needed
Whole-home humidifier or dehumidifier (ducted) Varies
Bathroom exhaust fan replacement (like-for-like) Not Needed
Dryer vent replacement or rerouting Varies
🏗️

Structural & Additions

ProjectPermit?
Home addition or room addition (any size) Required
ADU / accessory dwelling unit Required
Garage conversion to living space Required
Load-bearing wall removal Required
Basement egress window addition Required
Deck construction (new or replacement) Required
Porch or covered entry addition Required
Detached shed over 200 sq ft (varies by jurisdiction) Varies
Fence over 6 feet tall Varies
Swimming pool (in-ground) Required
Retaining wall over 4 feet Required
🏠

Roofing

ProjectPermit?
Full roof replacement (any material) Required
Partial roof repair (over a certain threshold) Varies
Skylight installation (new opening) Required
Gutter replacement or new installation Not Needed
Roof deck (sheathing) replacement Varies
Metal roof installation (new material) Required
Solar rooftop installation (integrated) Required
🏡

Interior Remodeling

ProjectPermit?
Kitchen remodel with electrical or plumbing changes Required
Cosmetic kitchen update (cabinets, countertops, paint) Not Needed
Bathroom remodel with fixture changes Required
Basement finishing (converting to living space) Required
Flooring replacement (any type) Not Needed
Fireplace insert or gas log installation Required
Attic conversion to bedroom Required
🌿

Landscaping & Site Work

ProjectPermit?
Irrigation / sprinkler system installation Varies
Grading and site drainage changes Varies
Driveway replacement or addition Varies
Paver or concrete patio installation Varies
Tree removal near utility lines or structures Varies

City-Specific Permit Requirements

Accurate local rules for 20 major US cities — requirements that differ from national norms

Always confirm current requirements directly with your city's building department before starting work. Permit requirements change regularly.

🗽

New York City

NY · NYC Department of Buildings (DOB NOW)

City Portal
  • NYC operates under its own building code, entirely separate from New York State code.
  • Licensed contractors only — virtually all work requires a licensed contractor on record.
  • Plan review for additions and major renovations: 3–12 months at busy periods.
  • DOB NOW digital portal for online permit applications and inspections.
  • Electrical: Licensed master electricians required for all electrical work (no exceptions).
  • HVAC replacements require permits and inspections in all five boroughs.
🌴

Los Angeles

CA · LA Dept. of Building and Safety (LADBS)

City Portal
  • Permit required for all work valued over $500 (parts + labor combined).
  • Fire-resistant construction mandatory in Very High Fire Hazard Severity Zones (VHFHSZ) — most hillside areas.
  • SolarApp+ system used for expedited solar permitting — often same-day approval.
  • ADU (accessory dwelling unit) permits are streamlined by state law — most are approved by right.
  • Seismic retrofit program: many pre-1980 soft-story buildings are required to retrofit.
  • HVAC replacement: permit and inspection required; Manual J load calculation for replacements.
🏙️

Chicago

IL · Chicago Dept. of Buildings

City Portal
  • Chicago operates under its own Chicago Building Code, separate from the statewide IBC.
  • Licensed electricians are required for ALL electrical work — no homeowner DIY electrical.
  • Permit approval for plan review projects: factor 4–8 weeks minimum.
  • Plumbing permits: city-licensed plumbers only. Unlicensed work carries steep fines.
  • Flat roof replacement requires permit and inspection (very common in Chicago).
  • Historic districts (Lincoln Park, etc.) require additional historic preservation approval.
⭐

Houston

TX · City of Houston Development Services

City Portal
  • Houston has no traditional zoning but building permits are required for construction.
  • Permit required for structural work, new builds, additions, electrical, and plumbing.
  • HVAC permit required within city limits; like-for-like replacement also requires permit.
  • Wind-resistant construction standards apply in coastal and near-coastal zones.
  • Harris County (outside city limits): minimal permit requirements in many unincorporated areas.
  • Online permitting via the ProjectDox system for plan review projects.
🌵

Phoenix

AZ · City of Phoenix Development Services

City Portal
  • Arizona ROC license required for all projects over $1,000 — verify at roc.az.gov.
  • Permit required for structural, electrical, plumbing, and HVAC work.
  • HVAC Manual J load calculation required for replacement systems per Arizona energy code.
  • Pool fences and safety gates are strictly enforced — required for all private pools.
  • Online permit portal available for simple permits (water heaters, HVAC, etc.).
  • Maricopa County: unincorporated areas have their own separate permit office.
🌺

San Antonio

TX · City of San Antonio Development Services

City Portal
  • Building permits required for all structural, electrical, plumbing, and HVAC work.
  • Adopted IBC/IRC with local San Antonio amendments.
  • No state residential contractor license in TX — verify TDLR specialty trade licenses.
  • HVAC replacement permit required within city limits; rough-in and final inspections.
  • Historic districts (Alamo Heights, King William) require additional HDRC approval.
  • Online permit applications available via AMANDA permit portal.
🌊

San Diego

CA · City of San Diego Development Services

City Portal
  • Permits required for work valued over $500 in most categories.
  • Coastal Development Permit (CDP) required for properties in the Coastal Overlay Zone.
  • Fire-resistant construction required in VHFHSZ areas (eastern and inland San Diego).
  • Solar permits expedited under California SB-48 — most approved in 1–2 business days.
  • ADU permits streamlined — many standard ADU designs pre-approved.
  • Grading permits required for slope work over 50 cubic yards of cut or fill.
🏙️

Dallas

TX · City of Dallas Development Services

City Portal
  • Building permits required for structural, electrical, plumbing, and HVAC work.
  • Adopted IBC/IRC with City of Dallas amendments — enforced strictly within city limits.
  • HOA rules do not exempt you from city permit requirements — both apply independently.
  • Roofing permits required for full replacements — hail damage is extremely common.
  • HVAC permit required for new installations; like-for-like replacement may be expedited.
  • Development permit portal available online at the Dallas ePlan portal.
🌁

San Francisco

CA · SF Dept. of Building Inspection (SFABI)

City Portal
  • Some of the most complex permitting in the US — factor 3–6 months for major projects.
  • Seismic retrofit requirements: soft-story buildings built before 1978 must retrofit.
  • All permits require a licensed contractor — no homeowner permits for most work.
  • ADU permits expedited — SF has one of the most ADU-friendly cities in California.
  • Historic districts and landmark buildings require additional SHPO review.
  • SFPUC backflow preventer inspection required annually for irrigation systems.
🌧️

Seattle

WA · Seattle Dept. of Construction & Inspections (SDCI)

City Portal
  • Washington State L&I contractor registration mandatory — verify before hiring.
  • Seattle Green Building Code requires energy efficiency upgrades during major remodels.
  • Seismic upgrade incentives available for older unreinforced masonry buildings.
  • Permit required for all structural, electrical, plumbing, and mechanical work.
  • Online permit center for simple permits — over-the-counter approval for many trades.
  • Tree removal: Seattle urban forestry permit required for trees over 6 inches diameter.
🏔️

Denver

CO · Denver Community Planning & Development

City Portal
  • Colorado has no statewide residential code — Denver adopted IBC/IRC independently.
  • Permit required for residential work over $1,000 (structural, mechanical, electrical, plumbing).
  • Wildland-Urban Interface (WUI) requirements apply in mountain foothills areas.
  • High-altitude radon: Denver metro has elevated radon levels — test before finishing basements.
  • Online permitting via the Development Services ePlan system.
  • ADU permits expedited — Denver has streamlined accessory unit approval since 2021.
🎸

Nashville

TN · Metro Nashville Codes Administration

City Portal
  • One of the fastest-growing permit offices in the Southeast — factor delays for busy periods.
  • Tennessee license required for GC projects over $25,000; specialty trades at lower thresholds.
  • Permit required for structural, electrical, plumbing, and HVAC work.
  • Adopted 2018 IBC/IRC with Metro Nashville amendments.
  • Online permit portal (Nashville Accela) for most permit types.
  • Short-term rental permits (Airbnb/VRBO) are separate from building permits — required.
🌴

Miami

FL · Miami-Dade County Building Department

City Portal
  • High Velocity Hurricane Zone (HVHZ) — the most stringent wind load standards in the US.
  • ALL roofing must comply with HVHZ requirements — non-compliant materials not permitted.
  • Impact-resistant windows and doors required in coastal zones and throughout Miami-Dade.
  • Pool safety fence and self-latching gate strictly enforced — required for all pools.
  • Florida Building Code (FBC) strictly enforced — no alternative materials without NOA.
  • Flood zone permits required for properties in FEMA flood zones (much of coastal Miami).
🍑

Atlanta

GA · Atlanta Office of Buildings / Fulton County

City Portal
  • Streamlined online permitting — many simple permits issued same-day via the portal.
  • Georgia state contractor license required for projects over the state threshold.
  • Permit required for structural, electrical, plumbing, and HVAC work.
  • Atlanta adopted Georgia's statewide building code (OCGA Title 8).
  • Tree removal: Atlanta Urban Forest Management ordinance — permit for protected trees.
  • Flood Zone: Chattahoochee floodplain areas require separate flood zone permits.
🎰

Las Vegas

NV · Clark County Building Division / City of Las Vegas DSD

City Portal
  • Nevada State Contractors Board (NSCB) license required for all work over $1,000.
  • Clark County and City of Las Vegas have separate permit offices — verify jurisdiction.
  • Adopted 2018 IBC/IRC; Clark County enforces additional energy code requirements.
  • Pool fences and safety gates strictly required — pool safety is heavily enforced.
  • Solar permits: Nevada has strong solar adoption; permits expedited for residential PV.
  • HVAC permits required — intense summer heat demands proper HVAC sizing and inspection.
🏛️

Boston

MA · City of Boston Inspectional Services (ISD)

City Portal
  • Massachusetts HIC registration required for all residential work over $1,000.
  • MA Stretch Energy Code applies in Boston — more stringent than baseline IECC.
  • Blower door testing required for new construction and major renovations.
  • Historic districts (Beacon Hill, Back Bay, etc.) require additional HDC review.
  • Permit required for all structural, electrical, plumbing, and HVAC work.
  • Cambridge: even stricter sustainability requirements — Envision Cambridge standards.
🌲

Portland

OR · City of Portland Bureau of Development Services

City Portal
  • Oregon CCB license required for projects over $2,000 — verify at ccb.oregon.gov.
  • Permit required for structural, electrical, plumbing, and mechanical work.
  • Portland Title 11 Tree Code: permit required to remove trees larger than 12 inches diameter.
  • Green building incentives available for LEED, Earth Advantage certified projects.
  • Historic districts (Ladd's Addition, Irvington) require additional approval.
  • Online permitting via Portland's Development Hub portal.
❄️

Minneapolis

MN · City of Minneapolis Inspections Services

City Portal
  • Minnesota DLI license required for contractors — among the strongest consumer protections in the US.
  • Licensed contractors must maintain mandatory bonds and insurance — verify before hiring.
  • Permit required for all structural, electrical, plumbing, and mechanical work.
  • MN Building Code based on IBC/IRC with cold-climate amendments for extreme freezing.
  • Radon mitigation required in new construction — Minneapolis metro is high-radon area.
  • Rental property licensing: separate certificate of occupancy required for rental units.
🌲

Charlotte

NC · Mecklenburg County Code Enforcement / Charlotte-Mecklenburg

City Portal
  • North Carolina NCLBGC license required for GC projects — verify before hiring.
  • Statewide NC Building Code (NCBC) enforced by Mecklenburg County.
  • Permit required for all structural, electrical, plumbing, and HVAC work.
  • Hurricane wind zone requirements apply across NC including inland Charlotte.
  • Online permit portal available for residential permits.
  • Storm drainage: Charlotte Water requires grading permits for major site work near waterways.
🌊

Tampa

FL · City of Tampa Construction Services

City Portal
  • Florida Building Code (FBC) strictly enforced — Tampa is in a hurricane wind zone.
  • All roofing replacements require permits and inspections — no exceptions.
  • Impact-resistant products required in coastal zones and areas within wind speed contours.
  • Pool fence and safety gate requirements strictly enforced.
  • Same-day permits available for like-for-like water heaters and HVAC replacements.
  • Flood zone permits required for many Hillsborough County properties near Tampa Bay.

Contractor Licensing — All 50 States

Licensing requirements and state board links — always verify with your local building department

🏛️

Alabama

State Board

The Alabama Licensing Board for General Contractors (ALBGC) requires a license for projects over $50,000 (or $10,000 for specialty work). Electricians, plumbers, and HVAC techs are licensed by the Alabama Department of Labor. Many counties require building permits for structural work — contact your county building department for local thresholds.

🐻

Alaska

State Board

The Division of Corporations, Business and Professional Licensing (DCBPL) licenses all contractors, with registration required for projects over $10,000. Electricians and plumbers are separately licensed. Alaska has adopted the 2018 IBC/IRC with state amendments for seismic and extreme cold construction requirements.

🌵

Arizona

State Board

The Arizona Registrar of Contractors (ROC) requires a license for all projects over $1,000. Contractor registration verification is mandatory — always check at the ROC website before hiring. Energy code (ACES) requires HVAC load calculations (ACCA Manual J) for new and replacement system installations.

💎

Arkansas

State Board

The Arkansas Contractors Licensing Board (ACLB) requires a license for projects over $2,000. Electricians are licensed by the State Board of Electrical Examiners; plumbers by the State Board of Plumbing Examiners. Arkansas adopted the 2018 IBC/IRC statewide, enforced at county level.

🌞

California

State Board

California CSLB (Contractors State License Board) has among the most stringent contractor licensing in the nation. ADU construction is streamlined by state law — many cities must approve ADUs by right. Solar permits are expedited under SB-48. Fire-resistant construction required in High Fire Hazard Severity Zones (HFHSZ). Title 24 energy codes are the most demanding in the U.S.

🏔️

Colorado

State Board

Colorado has no statewide residential building code — counties and municipalities adopt codes independently. Denver, Boulder, and Fort Collins have adopted the IRC with amendments. Wildland-Urban Interface (WUI) building requirements apply in fire-prone mountain communities. Radon-resistant new construction is required in many high-radon counties.

⚓

Connecticut

State Board

The CT Department of Consumer Protection (DCP) requires Home Improvement Contractor (HIC) registration for all work over $200. Electricians are licensed by DCP; plumbers by the Department of Public Health. CT has a statewide building code aligned with the 2018 IBC/IRC with state amendments. Local building departments enforce permits and inspections.

💙

Delaware

State Board

Delaware requires contractor business registration through the Division of Revenue. Electricians are licensed by the State Fire Prevention Commission; plumbers by the Delaware Professional Regulation (DELPRO). Building permits are issued at city and county level. The State has adopted the 2018 IBC/IRC. Dover and Wilmington have active local building departments.

🌴

Florida

State Board

Florida's Construction Industry Licensing Board (CILB) enforces strict statewide codes due to hurricane risk (Florida Building Code, High-Velocity Hurricane Zones in South Florida). All roofing replacements require permits. Pool safety fences and self-latching gates are mandated statewide. Impact-resistant windows and doors are required in coastal zones. The DBPR licenses all contractors.

🍑

Georgia

State Board

Georgia has a state minimum standard building code. Contractors must be licensed by the Georgia Secretary of State. Atlanta and Fulton County have streamlined online permitting. Energy Code (Georgia Energy Code) requires blower door and duct leakage testing for new construction and major renovations. Verify contractor license at the Secretary of State website.

🌺

Hawaii

State Board

Hawaii's DCCA Professional and Vocational Licensing (PVL) division requires a license for projects over $1,000. Electricians, plumbers, and HVAC contractors are all separately licensed. Hawaii has adopted the IBC/IRC with significant seismic and high-wind amendments. Honolulu's Department of Planning and Permitting (DPP) manages building permits for Oahu.

🥔

Idaho

State Board

The Idaho Contractors Board (ICB) requires a license for projects over $2,000. Electricians are licensed by the Electrical Board; plumbers by the Plumbing Board. Idaho has adopted the 2018 IBC/IRC statewide. All permit applications are filed with the local building department. Boise and Ada County have fully online permitting systems.

🌃

Illinois

State Board

Chicago has its own building code (Chicago Building Code), while the rest of Illinois adopts the International Building Code with local amendments. Plumber licensing is handled at the state level. Chicago requires licensed electricians for all electrical work. Permits in Chicago are often delayed — factor 4–8 weeks for plan review on major projects.

🏎️

Indiana

State Board

Indiana's Professional Licensing Agency (IPLA) licenses plumbers and electricians at the state level, but there is no statewide general contractor license. Building permits and codes are administered locally — Indianapolis, Fort Wayne, and other cities vary widely in requirements. Indiana adopted the 2020 IBC/IRC as a statewide minimum reference.

🌽

Iowa

State Board

The Iowa Division of Labor licenses electricians, plumbers, and HVAC contractors at the state level. There is no statewide general contractor license. Iowa has adopted a statewide building code based on the IBC/IRC, administered at local level. Des Moines and Iowa City have robust building departments with online permitting.

🌾

Kansas

State Board

The Kansas Department of Labor licenses electricians and plumbers at the state level. There is no statewide general contractor license. Building codes are adopted at city and county level — many rural Kansas counties have no building code requirements at all. Wichita and Johnson County have modern permit offices.

🏇

Kentucky

State Board

The Kentucky Department of Housing, Buildings and Construction (HBC) licenses contractors and electricians statewide. Plumbers are licensed by the Division of Plumbing. Kentucky has a statewide residential code based on the IRC. Local building officials enforce permits and inspections through county or city building departments.

🦐

Louisiana

State Board

The Louisiana State Licensing Board for Contractors (LSLBC) requires a license for projects over $50,000 for general contractors, but specialty subcontractor licenses (electrical, plumbing, HVAC) are required at any project size. Louisiana has one of the most comprehensive contractor licensing systems in the South. Wind zone requirements apply in coastal parishes.

🦞

Maine

State Board

The Office of Professional and Occupational Regulation (OPOR) licenses electricians and plumbers. Homebuilder registration is required for residential construction. Maine adopted the 2015 IBC/IRC with amendments. Energy code (IECC) compliance is increasingly enforced, including blower door testing for new construction. Local code enforcement officers issue building permits.

🦀

Maryland

State Board

The Maryland Home Improvement Commission (MHIC) requires a home improvement contractor license for all work over $500. Electricians are licensed by the Board of Master Electricians; plumbers by the State Board of Plumbing. Maryland adopted the 2018 IBC/IRC with state amendments. Montgomery County and Baltimore City have their own more stringent requirements.

🦞

Massachusetts

State Board

The Office of Consumer Affairs (OCABR) requires Home Improvement Contractor (HIC) registration for all residential work over $1,000. Electricians are licensed by the Board of Examiners; plumbers by the Board of Plumbers and Gas Fitters. The MA Stretch Energy Code (more stringent than IECC baseline) applies in 300+ participating municipalities including Boston, Cambridge, and Newton.

🚗

Michigan

State Board

Michigan LARA (Licensing and Regulatory Affairs) licenses residential builders, maintenance contractors, electricians, plumbers, and mechanical contractors. Michigan's Residential Code follows the IRC with state amendments. Permit applications are filed with local building departments. Detroit and Grand Rapids have streamlined online permit portals.

❄️

Minnesota

State Board

The Department of Labor and Industry (DLI) licenses residential contractors, remodelers, electricians, plumbers, and HVAC contractors. Minnesota has some of the strongest consumer protections for homeowners — licensed contractors must maintain bonds and insurance. The Minnesota Building Code is based on the IBC/IRC with state amendments for cold climate construction.

🎸

Mississippi

State Board

The Mississippi State Board of Contractors (MSBOC) requires a license for projects over $50,000 for general contractors. Electricians are licensed by the State Board of Electrical Contractors; plumbers by the Plumbing Board. Mississippi adopted the IBC/IRC with limited state amendments. Local permit offices are found at county or city building departments.

🦘

Missouri

State Board

Missouri licenses specialty trades (electricians, plumbers) through the Division of Professional Registration, but there is no statewide general contractor license. Missouri has a statewide building code (Missouri Building Code) but enforcement is primarily local. Kansas City and St. Louis have robust permitting systems; rural counties vary widely.

🦌

Montana

State Board

Montana's Department of Labor and Industry (DLI) requires building contractor registration for projects over $2,500. Electricians and plumbers are separately licensed by state boards. Montana has no statewide residential building code — individual cities and counties adopt codes at their discretion. Billings and Missoula have adopted the IBC/IRC.

🌽

Nebraska

State Board

Nebraska's State Electrical Board licenses electricians, and plumbers are separately licensed through the Division of Health. There is no statewide general contractor license. Omaha and Lincoln have active building departments with online permitting. Rural Nebraska may have minimal or no permit requirements.

🎰

Nevada

State Board

The Nevada State Contractors Board (NSCB) is one of the most active contractor licensing boards in the nation. Required for all projects over $1,000. Forty+ specialty license classifications including electrical, plumbing, HVAC. Unlicensed contractor penalties are steep. Nevada adopted the 2018 IBC/IRC statewide, with Clark County (Las Vegas) enforcing additional requirements.

🍂

New Hampshire

State Board

The Office of Professional Licensure and Certification (OPLC) licenses electricians, plumbers, and HVAC mechanics. There is no statewide general contractor license for residential work. New Hampshire adopted the 2015 IBC/IRC. Energy code compliance (IECC 2015 NH version) is increasingly enforced. Local building departments issue all permits.

🗽

New Jersey

State Board

The Division of Consumer Affairs requires home improvement contractor (HIC) registration for all residential work over $500 — one of the lowest thresholds in the nation. Electricians are licensed by the Board of Examiners of Electrical Contractors; plumbers by the Board of Master Plumbers. The Uniform Construction Code (UCC) is strictly enforced statewide.

🌶️

New Mexico

State Board

The Construction Industries Division (CID) of the New Mexico Public Regulation Commission licenses all contractors and provides statewide code enforcement. Required for projects over $20,000 for GC. CID has field inspectors throughout the state, unusual for the Southwest. Specialty trade licenses (electrical, plumbing, HVAC) are required at lower thresholds.

🗽

New York

State Board

New York City operates under its own Building Code (NYC Building Code), entirely separate from the New York State Uniform Fire Prevention and Building Code. Outside NYC, counties and municipalities adopt codes with amendments. NYC requires licensed contractors for virtually all work. Plan review for major projects in NYC can take 3–12 months.

🌲

North Carolina

State Board

North Carolina's statewide building code (NCBC) is enforced by county building departments. All electrical, plumbing, and HVAC work requires permits and inspections. Contractors must be licensed through the NC Licensing Board for General Contractors (NCLBGC). Hurricane wind zones in coastal areas require enhanced framing and roofing requirements.

🌾

North Dakota

State Board

North Dakota has no statewide general contractor license. Electricians are licensed by the State Electrical Board; plumbers by the State Plumbing Board. The State has adopted the 2018 IBC/IRC as a reference code. Building permits are issued by city and county building departments — rural areas may have minimal or no permit requirements.

🌰

Ohio

State Board

The Ohio Construction Industry Licensing Board (OCILB) licenses HVAC, electrical, plumbing, and refrigeration contractors. There is no statewide general contractor license — local jurisdictions (Columbus, Cleveland, Cincinnati) manage their own GC licensing. Ohio's Residential Code follows the IRC with state amendments. Plan review requirements vary by municipality.

🌪️

Oklahoma

State Board

The Oklahoma Construction Industries Board (CIB) licenses specialty trades including electrical, plumbing, HVAC, and mechanical contractors. General contractor registration is required for projects over $2,500. Oklahoma adopted a statewide building code (Oklahoma Building Code) effective 2016. Wind zone requirements apply in Tornado Alley communities.

🌲

Oregon

State Board

The Oregon Construction Contractors Board (CCB) is one of the most comprehensive contractor licensing programs in the U.S. — all contractors doing any work must be CCB licensed, with no minimum project size. CCB maintains a homeowner protection fund for consumers harmed by licensed contractors. Electricians and plumbers are separately licensed by the Building Codes Division.

🔔

Pennsylvania

State Board

Pennsylvania's Home Improvement Consumer Protection Act (HICPA), administered by the Attorney General, requires contractor registration for all residential work over $500. There is no statewide electrician or plumber license — these trades are licensed at the local level (city or county). Philadelphia has its own L&I licensing system, entirely separate from state registration.

⚓

Rhode Island

State Board

Rhode Island's Contractors' Registration and Licensing Board (CRLB) requires registration for all residential and commercial work. Electricians are licensed by the State Electrical Board; plumbers by the Plumbing, Heating, and Cooling Contractors Board. Rhode Island adopted the 2018 IBC/IRC with state amendments. Providence has active permit and inspection enforcement.

🌴

South Carolina

State Board

The South Carolina Contractor's Licensing Board (CLB) under SCLLR licenses general, mechanical, electrical, and plumbing contractors. Required for projects over $5,000 for GC; specialty trades have lower thresholds. South Carolina adopted the 2018 IBC/IRC with amendments. Coastal construction in CAMA (Coastal Area Management Act) zones has significant additional requirements.

🦅

South Dakota

State Board

South Dakota has no statewide general contractor license. Electricians are licensed by the State Electrical Commission; plumbers by the State Plumbing Commission. Building permits are issued entirely at the local level — rural South Dakota counties may have minimal or no permit requirements. Sioux Falls and Rapid City have modern permit offices with online access.

🎸

Tennessee

State Board

Tennessee's Department of Commerce and Insurance (TDCI) licenses contractors for projects over $25,000 (GC); specialty trades have lower thresholds. Electricians and plumbers are separately licensed. Tennessee adopted the 2018 IBC/IRC with state amendments. Nashville has one of the busiest building permit offices in the Southeast due to rapid development.

⭐

Texas

State Board

Texas has no statewide residential building code — many rural areas have few or no permit requirements. However, all major cities (Houston, Dallas, Austin, San Antonio) have adopted building codes. HVAC replacement permits vary widely by city. Texas does not license general contractors at the state level, but does license electricians, plumbers, and HVAC techs through TDLR.

🏔️

Utah

State Board

Utah's Division of Occupational and Professional Licensing (DOPL) licenses contractors for projects over $3,000. Electricians, plumbers, and HVAC contractors are separately licensed. Utah adopted the 2021 IBC/IRC with state amendments statewide. Salt Lake City and Utah County have active building departments with online permit tracking.

🍁

Vermont

State Board

Vermont's Office of Professional Regulation (OPR) licenses electricians and plumbers. There is no statewide general contractor license. Vermont's building code (VEELS) and its energy standards (Residential Building Energy Standards) are among the strictest in New England, requiring blower door testing and HERS ratings for new construction.

💐

Virginia

State Board

Virginia's DPOR (Department of Professional and Occupational Regulation) licenses contractors in Class A ($120K+/year revenue), Class B ($10K–$120K), and Class C (under $10K) tiers. Electricians and plumbers are licensed by the Board for Contractors. Virginia adopted the 2021 Uniform Statewide Building Code. Fairfax County and Northern Virginia jurisdictions have some of the highest building permit volumes in the nation.

🌲

Washington

State Board

Washington State's Department of Labor & Industries (L&I) licenses all contractors with mandatory registration. Seattle has additional requirements including Green Building Code incentives. Seismic retrofit programs are available for unreinforced masonry buildings. Contractor registration verification is mandatory before any work begins.

⛰️

West Virginia

State Board

West Virginia's Division of Labor (DOL) requires contractor registration under the Contractor Licensing Act for projects over $2,500. Electricians are licensed by the State Fire Marshal Electrical Division; plumbers by the Plumbing Board. West Virginia adopted the 2018 IBC/IRC with state amendments. Charleston and Huntington have active local building departments.

🧀

Wisconsin

State Board

Wisconsin's Department of Safety and Professional Services (DSPS) requires dwelling contractor certification and licenses electricians, plumbers, HVAC contractors, and master plumbers. The Wisconsin Uniform Dwelling Code (UDC) is a comprehensive statewide residential code with its own specific requirements, separate from the IBC/IRC. Milwaukee and Madison have robust permit enforcement offices.

🤠

Wyoming

State Board

Wyoming's Department of Fire Prevention and Electrical Safety licenses electricians. Plumbers are separately licensed. There is no statewide general contractor license and no statewide residential building code — some counties have adopted codes locally, but large portions of rural Wyoming have no building code enforcement at all. Cheyenne and Casper have local building departments.

Consequences of Skipping Permits

Insurance claims denied

Unpermitted work that causes damage (electrical fire, burst pipe) can result in your insurer denying the claim — leaving you responsible for the full repair cost.

Sale complications

Home inspectors flag unpermitted work during real estate transactions. You may be required to remediate or disclose it — often reducing your sale price or killing the deal.

Costly removal or rework

The building department can order you to demolish unpermitted work and redo it to code — at your expense. This can cost far more than the original permit fee.

Open permits stop refinancing

Open, uninspected permits appear on title searches. Lenders may refuse to refinance until all open permits are resolved — which can require re-opening walls and redoing inspections.

No legal recourse against contractor

If a contractor did unpermitted work and it fails, you have little legal recourse. Courts view both parties as having violated the law — even if you didn't know permits were required.

Fines and stop-work orders

Local building departments can issue stop-work orders and daily fines for code violations. In extreme cases, they can condemn a structure if work creates a safety hazard.

Hire contractors who pull permits

Ask each contractor which permits and inspections your project requires, who will obtain them, and what is included in the written estimate. Confirm requirements with your local building department.

Find Licensed Pros